A Form M licence is granted only when the godown is built exactly to the plan approved by the Department of Explosives. This guide lists the plot, building and safety requirements, and what to do if you do not own a suitable plot.
Why Construction Decides Your Form M Licence
A Form M licence covers storage of petroleum products and flammable chemicals in drums, cans and packages. The Department of Explosives first approves your storage plan. You build to that plan, an engineer certifies the work and an officer inspects the site. If the building does not match the approved plan, the licence is held back until it is corrected, which often means demolition and rework.
No suitable plot? Our DPL-ready rental godowns are already built to these requirements and come with the registered tenancy agreement your application needs.
Plot Requirements
Before You Build
- Minimum plot of 100 ft front × 160 ft depth
- Godown of about 40 ft × 60 ft in the middle of the plot
- 40 ft of clear open space on all four sides
- Location in an approved industrial or commercial area
- No natural gas main or electric transformer within 50 feet
- Vehicle access for loading and for the fire brigade
- Plot owned, or on a registered tenancy, in your name
- 100 × 160 ft
- 40 ft Clear
- Industrial Zone
Building Requirements
Built to Petroleum Rules 1937
- Walls of cement-concrete (C.C.) blocks with RCC columns; no wood
- Concrete floor with a 2-foot deep sump for spills
- Ventilators 6 inches above the floor and 1 foot below the roof
- Copper wire gauze on every ventilator to stop flames
- Doors with angle-iron frame and G.I. sheet, opening outward
- Non-combustible, spark-resistant roof
- Earthing to discharge static electricity
- C.C. Blocks
- Sump
- Ventilators
Godown Approval, Step by Step
- Step 1: Verify the plot size, location and the 50-foot rule
- Step 2: Prepare the storage plan to the Petroleum Rules 1937
- Step 3: Obtain the DC NOC and submit Form D to the Department of Explosives
- Step 4: Receive the approval letter and approved plan
- Step 5: Build the godown exactly to the approved plan within six months
- Step 6: Install fire-fighting equipment and no-smoking signage
- Step 7: Submit the engineer safety and completion certificate
- Step 8: Pass the Explosives inspection and receive the Form M licence
Fire Safety and Day-to-Day Conditions
The building is only half of the licence. The premises must also keep fire-fighting equipment as required by the Petroleum Rules 1937 (sand buckets, extinguishers and a hydrant where required), a trained guard on duty round the clock, strict no-smoking and no-naked-flame rules with signage, and stock records for every chemical on the licence. The Form M licence fee is a fixed Rs. 25,000.
We design and build godowns to these requirements and file the licence together, so the inspection passes the first time. See land requirements for plot details and our storage regulations guide, or move into a ready godown from our rental storage godowns.
Sources: Department of Explosives, Government of Pakistan licence process documents; Petroleum Act 1934 as amended in 2023. General information, not legal advice.
Godown FAQs
Can I get a Form M licence on a rented godown?
Can my existing warehouse be converted into a Form M godown?
Is wood allowed in a chemical storage godown?
Related Licensing Guides
How to Get a DPL License in Pakistan: Step-by-Step Guide
Petroleum Rules 1937 Pakistan: Licence Forms, Process and Fees
Need a Licensed Godown?
Build a compliant godown with us, or move into a DPL-ready rental godown with the licence filed for you.