Excellent Services

Petrol Pump
Construction & Form
K License Pakistan

Complete petrol pump station setup: site selection, Form “K” license, underground tanks, dispensers, fire safety and OGRA/OMC coordination.

Full Service

What's Included in Our Petrol Pump Service

Site Assessment & Selection

Before You Buy or Lease

Form "K" License & All NOCs

Petrol, Diesel & Lube Oil Storage

Underground Tank Installation

Safe, Compliant Fuel Storage

Dispensers, Canopy & Fire Safety

Per Petroleum Rules 1937

Petrol Pump Technical Specifications

01

Site & Feasibility

Plot assessment per distance rules, or we source a suitable plot for you.

02

Form K + NOCs

License application, challan, attested plans, and all department NOCs filed.

03

Construction

Tanks, dispensers, canopy, forecourt, and fire systems built in 4–6 months.

04

Launch & Renewal

Inspection passed, pump operational, license renewal tracked automatically.

Petrol Pump Construction in Pakistan

Petrol pump construction in Pakistan: fuel station forecourt with canopy and dispensers

Opening a petrol pump in Pakistan requires a Form “K” license from the Department of Explosives, which covers the storage of petrol, diesel, and lube oil at retail stations. Alongside the license, the station itself must be built to exact safety specifications, underground tank standards, dispenser calibration, fire protection per the Petroleum Rules 1937, and distance requirements from gas mains, schools, and residential buildings.

Why Pump Owners Choose Excellent Services

  • One window, site selection, Form K license, NOCs, construction, and OMC coordination handled by one team
  • First-time inspection pass, our stations are built to specification, so the Explosives Department inspection passes without rework
  • On-time delivery, 4–6 month construction schedules with dedicated site management
  • Renewal on autopilot, your Form K license enters our tracking system and renews every year without you lifting a finger
Step by step

How to Get a Petrol Pump License in Pakistan

A petrol pump needs approval from three sides: an Oil Marketing Company (OMC) for fuel supply, the district administration for the site, and the Department of Explosives for the Form K storage license. This is the order we follow for our clients.

01

Sign up with an OMC

Apply to PSO, Shell, TotalEnergies, Attock or GO. PSO asks for land you own or a lease with at least 20 years left, and takes applications online. The OMC surveys the site and issues a letter of intent.

02

Check the plot

Distance from schools, hospitals and homes, no gas main within 50 feet, and safe road frontage. We check this before you spend any money.

03

Get the district NOC

Apply to the Deputy Commissioner. Revenue, highways, traffic police, civil defence and the municipal body report on the site. Punjab uses the e-Biz portal; KP provincial roads need a C&W NOC. Some sites also need EPA environmental approval.

04

Apply for Form K

File with the Department of Explosives: attested site plan, NOCs and the treasury challan based on storage quantity. Form K is the DPL license for a retail station.

05

Build to specification

Tanks, dispensers, canopy and fire protection per the Petroleum Rules 1937. Construction takes 4–6 months while the license file runs alongside.

06

Inspection & opening

The Explosives Department inspects the station, issues the Form K license, and the pump opens. The license is then renewed every year.

Form K explained

Form K License for Petrol Pumps

Form K is the license every petrol pump in Pakistan needs to store fuel. It is issued by the Department of Explosives under the Petroleum Act 1934 and the Petroleum Rules 1937, and it is one type of DPL license. It covers petrol, diesel and lube oil storage at a retail station, in the quantities printed on the license. Adding tanks or capacity later needs an amendment.

The application is filed with the Department of Explosives together with the attested site plan, the district NOCs and the treasury challan. You do not need to find and fill in the form yourself: we prepare the complete file, submit it and follow it up until the license is issued.

Form K at a Glance
Petrol pump storage license
Issued by
Department of Explosives
Law
Petroleum Act 1934, Petroleum Rules 1937
Covers
Petrol, diesel and lube oil storage
Needed for
Every petrol pump, new or existing
Renewal
Every year, due by 1 December · renewal guide
Other forms
Form M, Form L (chemicals) · B-1 (CNG) · N, O (LPG)
What it costs

Petrol Pump License Cost in Pakistan

When people ask what a petrol pump license costs, they usually mean one of two things: the license and approvals, or the total investment in the station.

License & Approvals

Paperwork and government fees

Total Investment

Plot, building and equipment

Want a figure for your own plot and city? Use our free DPL Cost Estimator. We
send a costed breakdown within 24 hours.

Checklist

Documents Required for
a Petrol Pump License

CNIC copies

Owner or all partners

Proof of land

Fard-e-Malkiat, registry or registered lease

Site and layout plan

Attested by the district authority

OMC letter of intent

Or the dealership agreement

OMC's OGRA license

Copy of the marketing license

District & department NOCs

DC office, civil defence, traffic and others

Treasury challan

Form K fee, by storage quantity

Company papers

Only if you apply as a company

The exact list differs a little by province and by OMC. We prepare and file the complete set for you.

Before you buy or lease

Land and Distance
Requirements for a Petrol Pump

Corner plots on main roads work best. Check these four things before you commit to a plot.

500–1,000 m²

Forecourt area

Including canopy, approach roads and spill area.

50 feet

From any gas main

No natural gas main within this distance.

20 years

Minimum lease

PSO’s requirement for leased land.

Safe distance

Schools, hospitals, homes

Plus road frontage for safe entry and exit, checked by the district.

Not sure about your plot? We check it for free.

FAQ

Petrol Pump License FAQs

Petrol pump ka licence kaise milta hai?

Pehle kisi Oil Marketing Company (PSO, Shell, Attock waghera) se dealership approval lein. Phir apne district ke DC office se NOC lein, aur Department of Explosives se Form K license apply karein. Station ban jane ke baad inspection hoti hai aur license mil jata hai. Excellent Services yeh poora kaam one window mein karti hai.

License aur NOCs ka kharcha challan (fuel ki storage quantity), district fees aur consultancy par depend karta hai. Poori investment ka sab se bara hissa plot hota hai. Apne plot aur shehar ke hisaab se figure ke liye hamara free DPL Cost Estimator use karein.

District NOC mein aam tor par 45–60 din lagte hain. Construction 4–6 mahine ki hoti hai, aur Form K ka kaam saath saath chalta hai. Is tarah plot se opening tak aam tor par 6–8 mahine lagte hain.

Form K is the license issued by the Department of Explosives under the Petroleum Rules 1937 for storing petrol, diesel and lube oil at a retail station. Every petrol pump in Pakistan needs one, and it is renewed every year.

Your pump operates under an Oil Marketing Company that holds an OGRA marketing license, so the OGRA side runs through your OMC, and the NOC application to the DC usually includes a copy of the OMC’s OGRA license. We coordinate the OMC and OGRA requirements alongside your Form K license.

Yes. OMCs accept leased land, but the lease must be long enough. PSO, for example, asks for at least 20 years left on the lease. We check your plot and lease before you apply.

Form K is one type of DPL (Dangerous Petroleum License). Each form covers a different kind of storage: Form K for petrol pumps, Form M and Form L for chemicals, B-1 for CNG stations, and N and O for LPG. A petrol pump only needs Form K.

Ready to Build Your Petrol Pump?

Free site feasibility assessment: plot, Form K license, construction and launch under one window.

Scroll to Top